YW-AFS-2026-01 / APPENDIX 04

Installation & commissioning checklist

Complete every checkpoint with its evidence reference and both parties’ confirmation.

Download form (PDF) ↓Prepare service email →
Project / contract reference 
Customer / site location 
Equipment / model / serial number 
Site arrival date / installation mode 
Five commissioning checkpoints
StageConfirmationEvidenceDateBoth parties’ signatures
1 · ReceiptNo visible damage; correct quantity; nameplate matches contract.Unpacking photographs  
2 · PipeworkFlushed to clear water; test pressure and hold time meet approved requirements.Test record / photographs  
3 · ElectricalCorrect wiring; reliable earthing; acceptable insulation readings.Electrical / insulation record  
4 · First runNo leaks; correct rotation; parameters within agreed range.Parameter log / video  
5 · AcceptanceDesign duty achieved; acceptable water quality; controls operating correctly.Acceptance / water-quality reports  
Outstanding items / responsible party / due date 
Operator training / attendees / record 
Agreed warranty start date / basis 

The normal warranty start is completion and signature of checkpoint 5. Where the signed contract incorporates this policy’s condition, a customer-caused acceptance delay exceeding 30 days moves the start to equipment arrival at site. Record the agreed basis above.

Yuanwang representative / date

Customer representative / date