YW-AFS-2026-01 / APPENDIX 02
Overseas project record
Keep the agreed legal roles, delivery history and commissioning baseline together for future diagnosis.
A. Project & compliance
| Project / country / city | |
|---|---|
| Customer legal entity | |
| Importer of record: name / address | |
| Authorised representative (if applicable) | |
| Incoterm / named place / contract number / date | |
| Applicable product regimes / conformity route | |
| Declaration reference / issue date | |
| Technical documentation location | |
| Manual language versions | |
| HS code / required statutory inspection | |
| Shipment batch / arrival date |
B. Delivery & commissioning
| Unpacking inspection date / findings | |
|---|---|
| Installation mode: A / B / C | |
| Flushing / pressure-test completion | |
| Electrical / insulation-test record | |
| First water / initial run date | |
| Commissioning acceptance / signatories | |
| Training date / staff trained | |
| Warranty start / component expiry dates |
C. Initial operating baseline
| Parameter | Initial value / unit | Notes / design condition |
|---|---|---|
| Total circulation flow | ||
| Filter inlet / outlet differential pressure | ||
| Heat-exchanger inlet / outlet temperature difference | ||
| Pool water / system outlet temperature | ||
| Geothermal well yield | ||
| Geothermal dynamic water level | ||
| Geothermal outlet temperature | ||
| Water: pH / turbidity / hardness | ||
| Water: iron / manganese / chloride | ||
| Water: mineralisation / sand content |